Zainuri, Zainuri and Yanti, Gusneli and Megasari, Shanti Wahyuni (2015) ANALISIS PRODUKTIVITAS TUKANG KERAMIK. Program Studi Teknik Sipil, 1 (1). pp. 1-7. ISSN https://journal.unilak.ac.id/index.php/SIKLUS
Text
127-Article Text-215-1-10-20180214 (1).pdf Download (84kB) |
Abstract
Productivity of work of tiling the floor should be a concern for the contractor because the result depends on the skills and abilities ceramist. The purpose of this research is to determine the level of productivity ceramist taking into account of the work achieved and to determine the factors that affect productivity in the work ceramist ceramic couple floors of the building. The method used in this research is descriptive method. Productivity values obtained are : ceramist 1 of 0,0420 m2 /min; conductor 1 of 0,0394 m 2 /min; ceramist 2 of 0,0368 m2 /min; conductor 2 of 0,0347 m2 /min; ceramist 3 of 0,0290 m2 /min; conductor 3 of 0,0277 m2 /min; ceramist 4 of 0,0280 m2 /min; conductor 4 of 0,0265 m2 /min; ceramist 5 of 0,0283 m2 /min; conductor 5 of 0,0265 m2 /min. Keywords : Ceramist, productivity
Item Type: | Article |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Prodi Teknik Sipil |
Depositing User: | Dina Dina |
Date Deposited: | 10 Dec 2019 04:26 |
Last Modified: | 10 Dec 2019 04:26 |
URI: | http://repository.unilak.ac.id/id/eprint/637 |
Actions (login required)
View Item |